Proven reserves are 6.9 Mt grading 3.39 g/t Au. The reserves
includes high grade material of 1.77 Mt at 7.99 g/t Au and lower
grade material of 5.14 Mt at 1.82 g/t Au.
The pit
The crushing operation
View of the top of the heap leach pad (hose is for delivering sodium
cyanide solution onto the ore).